Reloading Synergize processes to refresh database connections

 

Intro:

Whenever there are changes made in the database or if a field is added/removed on a table, the process has to be reloaded to refresh the database connections. (Almost always the case after a TMW update)

Steps:

1. Backup your SPS processes

Start by taking a back-up of all your SPS processes. 

Go to C:\Program Files\Microdea\Synergize Process Server\Processes or C:\Program Files (x86)\Microdea\Synergize Process Server\Processes

Create a folder and name it as "Backup" (if you already don't have one). Copy all the processes and paste them in that folder.

mceclip0.png

mceclip1.png

2. Open Synergize Process Designer

Go to C:\Program Files\Microdea\Synergize Process Server and open Synergize Process Designer.

3. Reloading the process in Synergize Process Designer

I. Right-click on the process and click on "Process Designer"

mceclip2.png

II. Click on the "Reload" icon on the top (as shown in the below screenshot with a black box around it) and click on "Yes"

mceclip5.png

III. Click on the "Save" icon on the top (as shown in the below screenshot with a black box around it) and click on "OK"

mceclip4.png

4. Please repeat steps (I - III) for all processes.

 

 

 

Have more questions? Submit a request